INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

UG-84(i)(3)(a)(1)

UG-84(i)(3)(a)(1)

UG-84(i)(3)(a)(1)

(OP)
for semi-automatic/automatic welding, UG-84(i)(3)(a)(1) requires one product test plate (PTP) per WPS used for category A or B joints per welding position.
We have to do semi-automatic welding (FCAW)using one WPS for all A and B in Vertical Up and Flat positions, do we need 2 PTP's, although Vertical Up position qualifies for all positions when impact testing is a requirement, it does not make a sense to me that we need one PTP for flat position whereas one PTP for V-Up is already taken.

Nasir
Welding Engineer
DESCON ENGINEERING LIMITED
PAKISTAN

RE: UG-84(i)(3)(a)(1)

I read through UG-84 (i) 3 and it is clear that an impact test plate for Cat A and B joints is needed for each position employed in production welding if an automatic or semi-automatic welding process is used.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources