INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Does SW keep track of time spent.

Does SW keep track of time spent.

Does SW keep track of time spent.

(OP)
Autocad has had a feature that keeps track of total editing time since the DOS versions. Does SW (2012x64 SP1.0) keep track of time spent?
Thank you for your time

RE: Does SW keep track of time spent.

It's theoretically possible, but I hope it is either not implemented, or not easily accessible to management, given all the days I wasted trying things that didn't quite work, and trying to make sense of how 2005-ish tutorials applied to the 2009-ish versions I was using.

Did anyone ever try to really use the 'editing time' records kept by AutoCAD?

Mike Halloran
Pembroke Pines, FL, USA

RE: Does SW keep track of time spent.

This has been brought up before. It would be somewhat possible to implement with a macro (I messed around with it some). The problem is getting data that's at all meaningful or useful. With a 2-D AutoCAD drawing, all of the time that a document is active is time that is (or could have anyway) spent editing that document. With SolidWorks, the document actually being edited may not be the active document. You can modify parts and assemblies from an open drawing. You can modify parts directly from an assembly. You can modify a base part while a derived part is actually the active document. Modifying a base part might make significant changes on the assembly or drawing without even opening the asm/drawing file.

-handleman, CSWP (The new, easy test)

RE: Does SW keep track of time spent.

(OP)
Thanks.. thumbsup2 Given the complexity of active files I can see where it would be difficult...

RE: Does SW keep track of time spent.

I used to be able to do it with the SolidWorks Network Monitor. Been a long time, no sure how to set it up anymore. I'll have to check with our VAR.

Chris
SolidWorks 11
ctopher's home
SolidWorks Legion

RE: Does SW keep track of time spent.

Take a look at ManicTime (do a web search) this records time against a number of attributes. Its been a while since I used this but it was stable in Win7 and gave quiet a lot of info for usage.
Regards

RE: Does SW keep track of time spent.

(OP)
Thanks MangaMech... will give this a shot.

RE: Does SW keep track of time spent.

We use JTB World for tracking all of our licenses (Solidworks and AutoCAD). It does track license usage in hours, but it only tracks how long the license is being used. There is know way for it to determine if the software is actually being used. Either way it doesn't matter to us, because if a license is in use that license is being taken from the pool and could be used some where else if the user just has it open and is taking a break. That is why we track this so each dept\division can fork over some money for Subs when the next year comes due. Maybe then they won't just leave it up and walk away.

I don't think this is the answer you are looking for, but I thought I would post this in case some thing this will work for your needs as well.

Regards,

Scott Baugh, CSWP pc2
Berry Plastics
Cad Admin\Design Engineer
GEASWUG Greater Evansville Area SWUG Leader
www.scottjbaugh.com

Quote:

"If it's not broke, Don't fix it!"
FAQ731-376: Eng-Tips.com Forum Policies

RE: Does SW keep track of time spent.

SolidWorks 2013 Implemented a Administrator Option for Querying SolidWorks performance via the Web but the Report Disk Usage/Statistics must be in the Registry Settings for this to be possible. It can monitor Performance but to my knowledge hasn't been designed to track actual model edit time.

You may be able to track usage using the SolidWorks Jornal Files but that would require a script to copy the reg file out of the user's journal file folder or have them do a SolidWorks RX after each session which may waste more time than not tracking your users so harshly.

Unsure of Current Journal File location check the folowing Registry option
Run regedit
My Computer\HKEY_CURRENT_USER\Software\Solidworks\SolidWorks 2YYY\ExtReferences\SolidWorks Journal Folders\
This can be/should be customized if need be but is usually in My Documents. If you are not comfortable browsing your Registry Files *.reg
You can Search for "swxJRNL.swj" on your C: or Install Drive

hourglassWay to build trust among Employees. bomb

"It's not the size of the Forum that matters, It's the Quality of the Posts"

Michael Cole
Boston, MA
CSWP, CSWI, CSWTS
Follow me on !w¡#$%
@ TrajPar - @ mcSldWrx2008
= ProE = SolidWorks

RE: Does SW keep track of time spent.

<My Documents>\SW Log Files

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources