INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

model series of check dams with hydrocad

model series of check dams with hydrocad

model series of check dams with hydrocad

(OP)
[URL=http://imageshack.us/photo/my-images/507/checkdams...][/URL]

Uploaded with [URL=http://imageshack.us]ImageShack.us[/URL]

model a series of check dams as ponds
is it ok to just connect each pond together (see hydrocad model below)? my question is the tc I am using comes from the north west corner and down to the dam when the pond flows through the swale. DO i need to separate these somehow?

[/URL]]

RE: model series of check dams with hydrocad

(OP)
my question is should the tc be modeled like this? even tho it doesn;t show most hydrologically distand point I feel likt it is modeling the flow throught the swale? now sure. thanks

[/URL]]

RE: model series of check dams with hydrocad

(OP)
just note my first picture is also 3 subcatchments i just forgot to outline them with red like I did in the third pic

RE: model series of check dams with hydrocad

The Tc should be calculated just to the next node. The pond routing is already causing a a time delay due to routing effects. Including the pond in the Tc calculation will double-count that portion of the flow path and should be avoided.

If the distance between the check dams is significant (1000+ feet) you might use an intervening reach to simulate the travel time.

For details see www.hydrocad.net/tc.htm and www.hydrocad.net/checkdams.htm

Peter Smart
HydroCAD Software
www.hydrocad.net

RE: model series of check dams with hydrocad

(OP)
after doing some reading i think my first approach may be the right one? no need to add another tc for flow from one pond to the next? hydrocad calcs the time to fill up each pond in the routung calcs? no sure. thanks

RE: model series of check dams with hydrocad

(OP)
thanks psmart, so my first 2 drawings ( i know they are crude ) look like a good aproach to you?

RE: model series of check dams with hydrocad

Yes, the first sketch shows the approach I recommend. Each Tc flow path should end at the next pond.

Peter Smart
HydroCAD Software
www.hydrocad.net

RE: model series of check dams with hydrocad

(OP)
thanks

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources