INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PWHT requirements for Pressure vessel weld repair

PWHT requirements for Pressure vessel weld repair

PWHT requirements for Pressure vessel weld repair

(OP)
I am working on a Pressure Vessel Requalification project.

Is it required to conduct PWHT on weld repairs of pressure vessel eventhough the original construction doesn't require? The remaining plate thickness is 16mm A516 Gr.70.

Does any code (API 510 or ASME VIII) states some requirement on this specifically for weld repairs?

Appreciate your helpful comments.

RE: PWHT requirements for Pressure vessel weld repair


API-510, Clause 8.1 alearly states that "All repairs and alterations shall be performed in accordance with the applicable principles of the ASME Code, or the applicable construction or repair code.
Orginal welding was performed to ASME, i.e the design and construction code. As PWHT was NOT called for in the original construction, repairs need not be PWHT-ed. Although not mandatory as per API-510(8.1.6.4.2),controlled weld deposition technique would be advisable as a good repair technique.

Thanks.

Pradip Goswami,P.Eng.IWE
Welding & Metallurgical Specialist
Ontario, Canada.
ca.linkedin.com/pub/pradip-goswami/5/985/299


RE: PWHT requirements for Pressure vessel weld repair

(OP)
Hi Pradip,

Thank you for the useful info.

RE: PWHT requirements for Pressure vessel weld repair

Is this pressure vessel registered with the National Board? If so, NBIC Part 3 has specifics pertaining to weld repairs and PWHT.

RE: PWHT requirements for Pressure vessel weld repair

The NBIC defers back to the original code of construction for PWHT requirements, when possible. If PWHT is not practical, alternative methods can be used. For the above example, PWHT is not required for repairs if the original code of construction did not require it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources