INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

CBR Value of Solid Waste

CBR Value of Solid Waste

CBR Value of Solid Waste

(OP)
I am looking at designing a bituminous concrete paved roadway across 6 to 12 feet of old MSW.  I anticipate the need for geogrid reinforcment of the subbase.  How much I need will of course depend on the geotechnical characteristics of the underlying waste.

So can anyone let me know if there have been any design standard values established for the CBR of "typical" municipal solid waste?  Granted MSW is heterogenous, but other geotechnical design values have been established by common practice.  

Thanks ahead of time.

RE: CBR Value of Solid Waste

I would say that it is not possible to establish a "typical" value for MSW.  The variability of the material would make it impossible to predict what the CBR should be.  I would suggest that if possible you remove the upper portion of the MSW and replace it with light weight reinforced fill.  Another approach would be to make an economic determination of how much reinforcement you can add, add it and treat the expected failures as maintence items.

Hope that helps.

RE: CBR Value of Solid Waste

In my experience, building on MSW of any kind has been a failure in the long term, developing excessive waviness over a period of years. Obviously, it is diificult to characterize bearing strengths of MSW. In fact, I've seen some roadways repaired to correct this problem only to develop it again in the same spots. Specifically, I would contact the City of Columbus (ohio) Engineering Dept. and ask them about Olentangy River Road at Goodale St., a notorious spot for the problems described above.

RE: CBR Value of Solid Waste

I concur with agengineer.  Although economies of scale have to be considered, it may be better served, in terms of long term life of the road, to remove the landfill compose and replace with a structural fill more suitable as subgrade.  A (perf. pipe) subdrain system installed will also ensure that minimal moisture contamination will not deteriorate the subgrade stability.  Geogrid in combination with a geotextile will reduce the depth of fill necessary.  

KRS Services
www.krs-services.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources