Smart questions
Smart answers
Smart people
Join Eng-Tips Forums
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Member Login




Remember Me
Forgot Password?
Join Us!

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips now!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

Join Eng-Tips
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.
Jobs from Indeed

Link To This Forum!

Partner Button
Add Stickiness To Your Site By Linking To This Professionally Managed Technical Forum.
Just copy and paste the
code below into your site.

CRQUT (Structural) (OP)
21 Mar 13 23:33
Hi all,

We are connecting a new concrete beam to an existing 500mm thick reinforced wall.

My question is if we are relying on shear friction to provide essentially what is a pinned support to the beam by dowelling into the existing wall - can I pro-rata the shear friction capacity of the dowel based on a reduced embedment? i.e if say an N20 requires 650mm embedment to fully develop, and the bar is embedded 325mm, is the capacity half the fully developed capacity?

Appreciate you comments/ideas.

Cheers
CRQUT
hokie66 (Structural)
22 Mar 13 2:11
I don't think shear friction theory would allow this, but I don't really know, as I would never use shear friction for this type of connection. The wall is 500 thick, so there is no reason not to chip out some concrete and provide a proper seat.
TXStructural (Structural)
22 Mar 13 2:20
ACI 318-11 11.6.8 requires that reinforcement used to develop shear friction be fully developed (to fy) on both sides of the shear plane, by "embedment, hooks, or welding to special devices". Your code may vary from this. I assume you are planning to roughen the old concrete to sufficient amplitude to develop shear friction, but taking it back to the depth of the exiting reinforcement should also be considered.
JAE (Structural)
22 Mar 13 8:18
Not sure about your code but ACI's commentary discusses this I think. The answer is no - must fully develop the bars.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close