Guy wire terminations?
Guy wire terminations?
(OP)
I am looking for some typical procedures and details used to tension and terminate guy wires used to support tall tower type structures (antennas etc). I assume all cables at a level are all tensioned at once to avoid unduly loading the structure. How is the actual tension measured? How are they pulled into position? What do the terminations look like? Thanks for any insight.






RE: Guy wire terminations?
I honestly don't know too much about the construction of these types of towers. I only worked on the analysis of them. Therefore, I can't help you much further than pointing you towards that reference.
RE: Guy wire terminations?
RE: Guy wire terminations?
Quando Omni Flunkus Moritati