INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HEC-RAS bridge model w/ "scour" hole

HEC-RAS bridge model w/ "scour" hole

HEC-RAS bridge model w/ "scour" hole

(OP)
We are currently working on a hydraulic model for a bridge replacement. The existing and proposed bridges are both single-span, with abutments located outside of the stream banks. Our initial topographic survey of the area indicated that there was a "hole" in the streambed on the upstream edge of the existing bridge. Our initial assumption was that it was caused by scour; however, our scour analysis indicated that aggregation would most likely occur here, rather than scour. Therefore, we are assuming that the hole was caused by something else (possibly livestock). Based on our scour calculations, we ran the hydraulic model ignoring the hole. However, the reviewer has indicated that we should not be ignoring it. My questions are:

1. What is the correct way to model this situation, with or without the hole? Are there any references that address this?
2. Assuming that we have to indeed model it this way, what is the best way to model it? The problem lies in that because of the location of the hole relative to the bridge, so it is difficult to just add cross sections at the transition points.

Any help would be greatly appreciated. Thanks!

RE: HEC-RAS bridge model w/ "scour" hole

If your goal is to model bridge hydraulics say to acquire stage and flow relationship for various existing and proposed conditions, I don't think ingoring the hole will have any substantial effect on your results.

RE: HEC-RAS bridge model w/ "scour" hole

(OP)
Yes, that is our goal. From a regulatory standpoint, we are required to check backwater and freeboard for the existing and proposed bridges.

RE: HEC-RAS bridge model w/ "scour" hole

Add the hole and mark it permanently ineffective flow?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources