INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

LPile Loads

LPile Loads

LPile Loads

(OP)
I am analyzing a single pile using LPile V.5 using analysis Type 1- Computation of Pile Response Using Elastic Pile Stiffness (Basic Modeling). In trying to determine the maximum factored bending/shear forces along the pile length, are you supposed to enter in factored loads to determine these values directly from the output report/graphics or are you supposed to input unfactored loads and factor the results?

If factored loads are used, does a seperate run have to be performed for unfactored loads to determine an accurate deflection?

RE: LPile Loads

Unless it is specified in the applicable design codes, it's up to you. In my opinion carrying out the analysis with unfactored loads then applying a single factor to the resulting actions in the pile is the simplest approach and is covered by at least one national design code (the Australian Bridge Design Code, Part 3).

If you did the analysis with factored loads for the Ultimate Limit State, then yes, you should do another analysis with reduced factors (often all equal to 1) for the Serviceability Limit State, including deflections.

Doug Jenkins
Interactive Design Services
http://newtonexcelbach.wordpress.com/

RE: LPile Loads

Here in Alberta Canada the LPile analysis is normally carried on by Geotechnical engineer and the LPile analysis results are presented as charts in the soil report issued by Geotechnical engineer.

Structural engineer may also play with LPile and Group if there is P-Y curves provided in the soil report, but, legally it shall be coming from Geotechnical engineer.

Given the fact that the soil report is produced at the early time of the project and Geotechnical engineer has no control on the load combination factors used by Structural engineers, the LPile analysis charts coming from Geotechnical engineer is *ALWAYS* analyzed and presented using unfactored lateral load as the serviceability related check is always unfactored.

We normally take the chart, use it for serviceability check, and simply multiply a generic load factor such as 1.5 to get factored pile shaft moment and shear for pile section check. That should be accurate enough.
If you are analyzing the concrete pile, do remember to analyze twice, one for uncracked section and one for 0.25EI cracked section, which actually is quite conservative.

LPile claims that it can handle the non-linear concrete section by segments instead of a generic 75% stiffness reduction. I haven’t tried that yet and all the time I got from Geotechnical engineers is 2 sets of chart, one uncracked and one 0.25EI charts.

anchor bolt design per ACI 318-11 crane beam design
http://www.civilbay.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources