Wind load on minaret
Wind load on minaret
(OP)
What is the best procedure to apply wind loads on 20m high minaret with plan dimensions of 3mx3m? According to ASCE there is a method for "Chimneys, Tanks, Rooftop, Equipment, & Similar Structures"..resulting in concentrated wind force
I shall use this method or the regular method where we apply pressure on areas of walls...
I shall use this method or the regular method where we apply pressure on areas of walls...






RE: Wind load on minaret
RE: Wind load on minaret
In Russia building design you!