INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Wood - Segmented Shear Wall - Double Sheathing

Wood - Segmented Shear Wall - Double Sheathing

Wood - Segmented Shear Wall - Double Sheathing

(OP)
Per IBC the shear value using the perforate wall design method may not exceed 490plf, or for wind 1.4 x 490 = 686plf. If I have double sheathing can I double that value?

RE: Wood - Segmented Shear Wall - Double Sheathing

I never checked if the 2003 IBC allows the increasing of the 490plf for double sided.

But from what I see in the AF&PA SDPWS-2005 (referenced in the IBC 2006?) and the AF&PA SDPWS-2008 (referenced in the IBC 2009 & 2012) I would say no.

Garth Dreger PE - AZ Phoenix area
As EOR's we should take the responsibility to design our structures to support the components we allow in our design per that industry standards.

RE: Wood - Segmented Shear Wall - Double Sheathing

(OP)
Thanks - Does it explicitly state that you can not increase for double sided or is that your interpretation? I couldn't find anything either way.

RE: Wood - Segmented Shear Wall - Double Sheathing

I agree with woodman, I don't believe the code allows you to double it. Although, personally I typically never use perforated walls. If I'm going to put an opening in a wall I'll just use the Force Transfer Around Openings Method. Once you have a spreadsheet developed it takes only about a minute or two to do the analysis, and I believe it is much more rational. I suppose, the only time I would be tempted to use a perforated wall would be if the opening was a door, as it is my understanding that the Force Transfer Method may not apply in those situations (although some engineers try and use the rim board below). The times I have run across this have been few and far between and its just easier to add the extra holdowns you would have based on the segmental approach.

RE: Wood - Segmented Shear Wall - Double Sheathing

Well you can do a double sided shearwall (Say you use a 290 plf nailing/sheathing on both sides) and increase the shearwall up to the 490 plf maximum. But going over the 490 plf is not allowed, as I see it. But again, I have never look into going above the 490 plf for this condition.

Garth Dreger PE - AZ Phoenix area
As EOR's we should take the responsibility to design our structures to support the components we allow in our design per that industry standards.

RE: Wood - Segmented Shear Wall - Double Sheathing

(OP)
Got it, thanks.

I'm rebuilding a wall to match an original condition and finding that it doesn't come close to working. Makes sense to me but the architect doesn't understand that 'it doesn't work' when it was standing just fine for 100 years. I'm trying to squeeze every ounce out of it to get it to work.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources