INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Exterior Slabs

Exterior Slabs

Exterior Slabs

(OP)
I was recently asked by an architect to design a loading dock slab (the slab outside of the building adjacent to the loading dock). Typically our scope is limited to be the extents of the building envelope, and miscellaneous portions of the structure attached to the building. When we design sight structures, retaining walls, light post bases, etc ., we do these as an additional service. I indicated to the architect that exterior pavements should be under the scope of the civil engineer, but the civil has excluded it from their scope as well.

Am I in the majority in excluding this design from the base building design?

RE: Exterior Slabs

What's in your contract?

RE: Exterior Slabs

The scope tells the story, and it is commonly done both ways. It should be in either the building engineering or the civil engineering works. If not, the architect has omitted it, and now has to get somebody to do it.

RE: Exterior Slabs

Agree that it wasn't coordinated. I've seen a reluctance by general civils to design anything vertical, including retaining walls. I would generally consider that a loading dock would be adjunct to the building, not the site pavement.

RE: Exterior Slabs

(OP)
We specifically exclude pavements in our contract. There appears to be a hole in the scope, and since we work for the architect, and the civil does not he has come back to us. I don't have a problem with adding this to our scope, but since the civil engineer is providing all pavements up to this slab I believe that this is better added to his work.

RE: Exterior Slabs

We typically design the loading dock and retaining walls, but not the loading dock ramp. Anything that is pavement we consider to be in the civil engineer's scope.

RE: Exterior Slabs

From a civil perspective, steellion's response is the same as mine. I would expect the structural to design the dock and ramp side walls.
I wouldn't have a problem doing it, but it would probably cost more because I don't do it often and would have to review some things that I may have forgotten since the last time.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources