In upper floor, the column is 3.2 meters and the formworks would be about 3 meters and they would be poured at once. Is this not too long and can cause honeycomb at the bottom? But renting pumpcrete is expensive if only say 2 meters would be poured, what do you think? Is external vibrator effective as the vibrator put from the top may not be long enough to reach the bottom.






RE: 3.2 meter column formworks
RE: 3.2 meter column formworks
Concreting of 3 meters height columns is not an issue if the formwork is level and tight with good supports.