tie beam not on soil
tie beam not on soil
(OP)
The usual procedure is to first put compacted soil and put the tie beam on top of the compacted soil so the weight would bear on the soil and not the columns. But in one of the tie beams in the constuction site, the tie beam was poured with concrete using just wooden support (and not soil because trying to reach schedule). The tie beam right side also served as the stair support. Now I don't think it's possible to insert tight compacted soil under the tie beam, what do you guys usually do in this case?






RE: tie beam not on soil
RE: tie beam not on soil
But the tie beam is about two meter above mat foundation. If I put lean concrete mix, the mat foundation can no longer have bending moments or the foundation can't bend at its center. Flowable fill stil not compacted enough.
RE: tie beam not on soil
Or maybe have them place concrete columns under the tie beam down to the mat before importing the soil?
RE: tie beam not on soil
I think the solution is to put 1 square foot pure concrete column every 3 meter of the tie beam. Since it's a tie beam, it's designed only to distribute the main column moments and not to bend from weight. But the problem is putting the 1 square foot columns can prevent the mat foundation portion from bending due to its being constrained by the tie beam. How do you guys usually handle this situation?
RE: tie beam not on soil
RE: tie beam not on soil
RE: tie beam not on soil
As a side note, how would a stiffer mat hurt anything? The only way it would become stiffer is if more material were activated in resistance which, it seems, would increase the moment arm of your reinforced section and presumably make the whole thing stronger?
RE: tie beam not on soil
Gets you the support of the tie beam and allows everything to move the way you want it to.
RE: tie beam not on soil
I assume a flowable fill is more heavy than compacted fill? I haven't used flowable fill before. And I don't want to use concrete lean mix as it would be much heavier than compacted fill and can affect settlement of the foundation.
Also I think flowable fill would be more compacted than trying to compact the soil a few inches under the tie beam? Any others with experiences on this?
What do you commonly use between the mat foundation and tie beam anyway?
RE: tie beam not on soil
anchor bolt design per ACI 318-11 crane beam design
http://www.civilbay.com
RE: tie beam not on soil
RE: tie beam not on soil
the tie beams are just to distribute the moments in the columns of the mat foundation, why is this concept foreign to you? tie beams have two purposes:
1. to distribute moments of the columns
2. to avoid differential settlement
since the foundation is mat, there is not differential settlement, so the purpose is to distribute moments of the columns
RE: tie beam not on soil
I'm also not familiar with this type of system you are describing. Do you have a mat with soil over it that then has tie beam between the columns?... If so, why isn't the mat up higher?....
I am very familiar with mat foundations and your statement that there is no differential settlement is not true. It is far less with a mat, but not entirely gone. I would have integrated tie beams or stiffeners in the mat to account for the column moment distribution.
I agree with hokie, you need to provide a section.
RE: tie beam not on soil
It's very simple, the building has 5 columns, 4 at corners and one at center. The rock is 3 meters below. The mat foundation is on top of the rock and the ground slab (which is at level with the tie beam) is about 2 meters above the foundation. Hence tie beams on ground slab level is needed. If you would integrate the tie beam on the foundation, the columns would become longer.
RE: tie beam not on soil
Why are you using a mat foundation on rock? Is it really rock?
BA
RE: tie beam not on soil
not really rock, but very dense silty sand, above it is clay that is why mat foundation is put on the dense silty sand. the tie beam can support its own dead weight, but it's supposed to be carried by the soil, not the columns which can only stress the columns, the size of the tie beam is 400mm depth, 300mm width, 6 meters, 3 top bars at support, 2 top bars at midspan, 2 bottom bars at support and midspan. the foundation is already casted in concrete.. only two tie beams at front don't have the soil between it and the mat foundation because of schedule constrain.
Maybe I can put a steel column between the tie beam and foundation at midspan? but if the foundation bends, the tie beam maybe bent upward and get damaged.
RE: tie beam not on soil
RE: tie beam not on soil
BA
RE: tie beam not on soil
RE: tie beam not on soil
RE: tie beam not on soil