INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Fatigue loading for steel bridge under light rail.

Fatigue loading for steel bridge under light rail.

Fatigue loading for steel bridge under light rail.

(OP)
I am assessing existing highway steel box-girder bridge for light rail loads. The fatigue loading is not well defined in the project design criteria. It references fatigue design to AASHTO which deals with highway loads. The main dilema is: how many trains shall be on two-track bridge? According to AREMA: two, if to follow AASHTO ideology: only one.
Greatly appreciate sharing experience on this subject!

Yakpol

RE: Fatigue loading for steel bridge under light rail.

I'm not a bridge engineer, but I've seen enough of lightrail operation to say that if it's possible for both tracks to be occupied at the same time, there will be times where both are occupied. Signaling systems could limit use to one track at a time.

RE: Fatigue loading for steel bridge under light rail.

You should use two trains as loading. You may follow AASHTO for the fatigue design, as far as detailing and allowable stresses ranges. Keep in mind, that for steel structures allowable stress method is used, and for concrete (any kind) load factor design is considered.
Also, for railway structures indefinite number of load cycles is always used.
With steel box girder typical details to be carefully checked will be the diaphragms and cross braces.

RE: Fatigue loading for steel bridge under light rail.

(OP)
wictor,
Thank your for reply. I am dealing with an existing roadway bridge.Infinite number of cycles for two trains kills every single detail. This criteria is very good for a new bridge, but too conservative for existing.

Yakpol

RE: Fatigue loading for steel bridge under light rail.

See if you can find the anticipated usage (people per hour per direction) and design life for the system. Then depending on the fully loaded car capacity you can make a determination.

HTH

VoD

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources