INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hinges and collapse

Hinges and collapse

Hinges and collapse

(OP)
hey everybody,

i'm designing a framed concrede structure for a test on the ductility of recycled concrete. The structure has two floors and on each one i have 2 cables pushing the structure. In order to dimension the foundations, I need to estimate the forces for the collapse mechanism.
How would you model such situation?

I defined PMM hinges using the moment curvature relations from the section designer of Sap and applied the cable forces as nonlinear. I defined them with a small value and changed their scale factor to reach the collapse. The problem is that i dont reach it. The hinges change their states but the structure just keeps receiving higher and higher loads and the analysis only stops because of a huge number of null steps.

Any ideias of what I can be doing wrong?
Any help is MUCH appreciated

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources