Chemical dosing slugs
Chemical dosing slugs
(OP)
Hi,
I am having a problem with slugs when starting a chemical dosing pump. Once flow is established
the system behaves normally which normally occurs after about 5 to 6 strokes. The issue is that
an unacceptable level of chemical is introduced for a short period of time.
The dosing pump is about 400m away from the injection point where it is mixed with carrier water
before injecting into the mains.The system also has a degassing line which activates each time the pump
starts. Have tried initial lower and higher dosing rates but no change. Any suggestions would be appreciated.
I am having a problem with slugs when starting a chemical dosing pump. Once flow is established
the system behaves normally which normally occurs after about 5 to 6 strokes. The issue is that
an unacceptable level of chemical is introduced for a short period of time.
The dosing pump is about 400m away from the injection point where it is mixed with carrier water
before injecting into the mains.The system also has a degassing line which activates each time the pump
starts. Have tried initial lower and higher dosing rates but no change. Any suggestions would be appreciated.





RE: Chemical dosing slugs
Good luck,
Latexman
Need help writing a question or understanding a reply? forum1529: Translation Assistance for Engineers
RE: Chemical dosing slugs
RE: Chemical dosing slugs
Pipe the carrier water system to within 2 meters of the chemical feed pump and you will solve your chemical pumping issues.