INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PSV Servicing

PSV Servicing

PSV Servicing

(OP)
What are the minimum content requirements to be put onto a PSV Service Tag, attached to the PSV after servicing?

RE: PSV Servicing

(OP)
I have seen PSV Service Tags with:
- name of the Service Organization,
- PSV set pressure
- Date of servicing,
- PSV ID number
- PSV serial number

Is this a requirement from any Code or Standard?


RE: PSV Servicing


An interesting question, but I am supporting hsbcn, and would like to add following:

Having been involved in both supplying, servicing and describing PSVs, supplying tags and datasheets, I have seen too many datasheets and tags giving the information of 'everything you need except the necessary information you need to supply service, parts or a new product'.

Today you have, on the technological front end, the possibillity of electronic tags, giving by portable electronic readers/PCs or inline or by radio information to control office, all relevant information, including full description of make, type, dimension, drawings, process conditions, performance and track record etc.

In that case a written tag need only give a cross reference to the electronic (or written) record, plus identify the placement of the product if removed for repair or service.

This is then the minimum requirement. If you need anything more, this should be as described by hscbn on a 'need to know' basis.

The tag content and form is often 'standardized', but by the companies. The reason is, as described above, the plants overall current system status for detailed part/machinery information record. This could be everything from full electronic to almost non-exsistent records. If necessary, the starting point could then be revising the record-keeping and tracing system.

Standards, rules and regulations on a 'general or higher' level, from outside the company, will in my experience be limited, requiring tagging for components (if included) for tracing the component information, which could be recorded 'anywhere'.

(Note: Theese comments on tagging to be seeen apart from 'marking/factory signs' and the marking of products which is required in production standard and codes for the product itself, or for certain plants (atomic powerplants????).



Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources