INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

When to perform Concrete Leakage Test

When to perform Concrete Leakage Test

When to perform Concrete Leakage Test

(OP)
I have a new concrete structure for a waste water treatment plant (divider walls creating 6 basins). The interior of the basins will be painted with a waterproof coating system. There is one basin wall that is shared with the equipment building. There are 6 different basins that would need to be tested, independently. In order to know if they're leaking, they would need to dry out in between tests so it would be a very time consuming process to leak test.

1. Do I need to specify a leakage test? I have not specified them before on either WTPs or WWTPs but don't want to continue that if they should be happening.
2. If yes, does the leakage test need to be performed prior to application of the waterproof coating?
3. If yes, how long do the basins need to dry out after draining all the test water out? This is coastal so I know humidity will play a role in drying time - I'm just looking for a guideline to use.

Thanks!

RE: When to perform Concrete Leakage Test

1. Do I need to specify a leakage test? I have not specified them before on either WTPs or WWTPs but don't want to continue that if they should be happening.
Answer; Yes, if you want to make sure they don't leak. I'm surprised you've never specified them before.
2. If yes, does the leakage test need to be performed prior to application of the waterproof coating?
Answer; You want the concrete to be leak tight. If you put on the coating, it's likely to "mask" some leaking. So test it before it's coated.
3. If yes, how long do the basins need to dry out after draining all the test water out? This is coastal so I know humidity will play a role in drying time - I'm just looking for a guideline to use.
Answer; That's up to your coating manufacturer. There are tests to make sure the concrete isn't still releasing water.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources