×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Indian Boiler Regulation IBR Evacuation Unit

Indian Boiler Regulation IBR Evacuation Unit

Indian Boiler Regulation IBR Evacuation Unit

(OP)
Dear all,

the equipment is an Evacuation Unit for Turbine-Condensers in Power Plants in India.
The unit consists of a Surface- Condenser, Motive Steam Piping and Suction Piping (one skid). The unit is not directly connected to the boiler.

DESIGN DATA:
Surface Condenser
Tube Side (Cooling Condensate): p=9,00 barg T= 100°C V= 180 l
Shell Side (Steam): p=0,98 barg T= 320°C V= 200 l

Motive Steam Piping: p=20,7 barg T=365°C DN 50 (max)

Suction Air Piping: p=0,98 barg T=300°C DN 150 (max)

My question:
Is this unit because of the Design Data´s under the IR? If yes, what is the normal procedure (3rd Party; special requ. for Manufacturer etc.).

Thank you very much in advance.

Tim

RE: Indian Boiler Regulation IBR Evacuation Unit

(OP)
sad

RE: Indian Boiler Regulation IBR Evacuation Unit

Just recently finished an IBR project (We supplied some reheater assemblies). I am not sure that your equipment would fall under the IBR but with all India projects the determination is by the local authority.

Some items to be aware of.

IBR require that your welder be requalified to the IBR code, they may not accept the their ASME or EN qualification.
A Third party must witness all welding testing, (from weld through cutting and bending).
A Third party must witness the fabrication and testing.
Materials, tubing, plate etc must be purchased from an IBR approved mill, (This could be very limiting).
Will need IBR form ??? for the welding consumables.

Lots of paperwork, our documentation package for the customer was over 3000 pages

Richard www.6sproductivitycom.com

RE: Indian Boiler Regulation IBR Evacuation Unit

(OP)
Thank you very much. It seems not easy... After recheck with our third party now we know that our equipmnent is under IBR.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources