INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Ties Spacing / transverse Reinforcement in Piles

Ties Spacing / transverse Reinforcement in Piles

Ties Spacing / transverse Reinforcement in Piles

(OP)
I have a question about the tie spacing / transverse reinforcment in piles. I am in a low seismic Region so chapter 21 of the ACI 318 does not apply to me. Also ACI 318 states in chapter 1, that ACI 318 is not for piles unless for high seismic regions.

From ACI 543 in the Structural Design Considerations Chapter that "PILES THAT HAVE SIGNIFICANT BENDING MOMENTS WILL OFTEN HAVE SIGNIFICANT SHEAR FORCES" Chapter 11 from ACI 318 should be followed when designing shear Reinforcement.

What is SIGNIFICANT? Spacing limits for shear reinforcement is d/2 ; that seems intense to me for a pile. With the loadings I have on my piles the Concrete strength (Vc/2) can almost take all the shear. I can be less conservative and reduce my shear.

Again what is significant 5 kips, 25 kips, 50 kips of shear??

Someone can argue that 1 kip or 2 kips of shear is significant and that I have a significant bending member and must use d/2 for my tie spacing.

RE: Ties Spacing / transverse Reinforcement in Piles

Piles are normally columns, and should have ties in accordance with column requirements. If they are subject to bending, they are then beam/columns, and should have stirrups in accordance with beam requirements.

RE: Ties Spacing / transverse Reinforcement in Piles

(OP)
Again ACI 318 does not govern pile design according to Chapter 1 unless in high Seismic regions. ACI 543 mentions significant Bending moment and significant shear forces.

RE: Ties Spacing / transverse Reinforcement in Piles

(OP)
Thanks, I did some more further reading in the ACI 318. The Commentary expands on the topic that the ACI 543 is a Recommendation. It also touches-on that pile desing is regulated by the general building code fully embedded in the ground.

The ACI 543 references back to ACI 318

RE: Ties Spacing / transverse Reinforcement in Piles

@x5bulldog> What type of pile is it? Typically cast-in-place piles not enclosed by a structural steel pipe or tube are reinforced when subjected to uplift or where the required moment strength exceeds the design cracking moment of the pile. The same logic may be extended for shear design.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources