INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Structural Modification of Offshore Platform Checklist (An Ideal Site Visit Verification Checklist)

Structural Modification of Offshore Platform Checklist (An Ideal Site Visit Verification Checklist)

Structural Modification of Offshore Platform Checklist (An Ideal Site Visit Verification Checklist)

(OP)
I will be going for a site visit of an existing offshore platform which is to be linked to another platform (proposed) via a bridge connection.
Please does anyone have a typical verification checklist from a structural point of view?

RE: Structural Modification of Offshore Platform Checklist (An Ideal Site Visit Verification Checklist)

Do you have original structural drawings? How much do you know about the construction quality assurance and drawings control? It really depends on the trust you have in the drawings and their implementation. If they're reasonably accurate it may just be a question of spot checking major and/or critical dimensions, poking around and making sure nobody's gone and added significant loads or cut away at anything and making sure there isn't obvious corrosion or other things of that sort.

If you don't have drawings, have reason not to trust them, or find obvious things that don't match you might end up having to go in and measure every property that could reasonably affect your work.

If there are halfway reasonable drawings I'd generally prefer to have a walkaround at the beginning of the project to ensure that the drawings are right in concept, then do a verification of the information used for my design just prior to or during the IFR stage. That way you aren't trying to as-built absolutely every part of a complicated structure but you've done your due diligence at the beginning so you aren't completely blindsided and you can actually fully investigate the important things later once you have a full plan and know what matters.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources