INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

(OP)
Hi All,

I am wondering about how to fill out API mechanical data sheet supposed to cover 2 different operation condition? in the other hand, we have a 2+1 condensate transfer pumps with specified conditions . but this pump's capacity will be different after 5 years. how it can be?

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

I've provided two sets of conditions in the past, call it initial and future or whatever terms you use and see what the vendors propose and then see if you agree with their proposal considering the initial and final operation.

Without some more information to the system, controls, etc it's hard to get much more specific.

I had a system where we were offloading tank cars through a common line, we had to design the system from one pump oto three running in parallel. With the line losses, I knew the discharge pressure was going to vary enough to worry me. We summarized the information and sent it out for proposals. While we got proposals back, when we looked at the proposals and curves we ended up having to install a backpressure control valve as none of the centrifugal pumps could handle the range of discharge pressures without running off the end of their curves. Just don't accept the vendors' proposals, you need to look at them in light of your system and its design.

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

Pumps are designed and sold for only one GUARANTEED operating, or design point. That is typically the "design" point on the data sheet with the "normal" point being a secondary condition, but not guaranteed.

Of course that is not to say a manufacturer can't give any additional assurance for the remainder of the performance curve; but it has always been the practice of manufacturer's to guarantee one point.

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

After 5 years it might be time to think about upgrading the unit/s to something more suited to the new pump duty - plus you haven't indicated current and future hydraulic duties, so how do expect to get any meaningful feedback.

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

You still can specify the 2 conditions by using the remarks / Note at the bottom of the sheets.
Let the vendor work out how can they met these conditions...There are many options depending on the conditions

1) by impeller change--bigger or samller
2) By adding or removing impellers if it is multi-stage pumps-- casing and motor based on the most stringent requirement.
3) Using VFD..

It all depends on the changes required.

Before you issue the formal inquiry, you better talk to some vendors first to make sure it is workable.

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

I just use two data sheets, and on each data sheet I state that:

"This pump is one and the same pump as is specified on (the other) data sheet, so it must perform satisfactorily at each service condition."

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

Two data sheets is probably the best approach. Just make sure there is a clear understanding of the "performance guarantee" within the contract documents. Many vendors have written into their standard T&C's that only one point will be guaranteed.

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

The second data sheet should be marked-up as anticipated future duty or some similar statement to safeguard your pump selection in the future. Only guarantee 1 duty point which should be for the initial duty.

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

I assume this is a centrif pump, API 610? You should specify the worst’s case condition, i.e. highest head and flow, once you receive the pump curves from the pump supplier you should check that any other operating conditions the pump may need to work in fall within the limits of the curve, i.e above the minimum flow requirements (unless you have a recycle). As DubMac has said above the pump supplier will only guarantee one operating point, and the supplier should select the pump and impellar size which has this one operating point as close to the BEP as possible.

You should also ensure the pump supplier shows the min and max impeller curves on the proposal curve, as for your year 5 case you may want to the impellars so you can operate nearer the BEP.



RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

Ops, Trim the impellars!

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

Most respected pump companies have selection software avaialable. What I would do having to hand initial bids is to use the suppliers software to investigate how the pump will perform over the range of anticipated duties. Then meet with the pump supplier to discuss the findings. If agreement can be reached as to how the pump will perform establish a guarantee point for the contract. Then ensure the pump has tight test requirments and witness the testing.

Yes you may have to trim the impellers, fit a larger impeller or adjust the flow control valves in the system in the future. Pipes may age but they may also be cleaned or replaced. Future process duties are notorious for being wrong. The "future" as you see it now may not be what it is when it occurs!

“The beautiful thing about learning is that no one can take it away from you.”
---B.B. King
http://waterhammer.hopout.com.au/

RE: How Fill Mechanical Data Sheet for a Pump covering 2 different operation condition?!!!!!

Seems as though the OP Sabergg1981 has vanished anyway- so we are now spinning wheels.

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources