INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

30" dia oil pipeline derating

30" dia oil pipeline derating

30" dia oil pipeline derating

(OP)
Hi all,
we are in the process to derate the 30" API 5L B dia oil pipeline (158km), wall thickness is 80% gone due corrosion and this line was installed some 40 years back.
as per barlow's equation MAWP is coming 112 psi,my question is, can i further derate the line as operation manager requested to derate untill line is composite repaired.I don't have copy of B31.4 for reference.
thanks
10815L

RE: 30" dia oil pipeline derating

I don't think B31.4 is the appropriate reference, that's the design code for the pipeline when it was installed. I'd be looking at API 570 "piping inspection" to see if that's a better choice.

RE: 30" dia oil pipeline derating

Yes, B31.4 is the correct reference.

"(c) If a piping system is derated to a lower operating
pressure in lieu of repair or replacement, the new maximum
steady state operating pressure shall be determined
in accordance with para. 451.7."

my 2006 version of B31.4 does not have paragraph 451.7, but I think the correct reference is 451.6 Pipeline Integrity Assessments and Repairs.

Paragraph 451.6 is too many pages to incorporate in this posting.

hope this helps.
-pmover

RE: 30" dia oil pipeline derating

None of the codes really control this. Usually the limiting factor is company policy.

I assume you solved Barlow's formula for pressure and put SMYS and the actual wall thickness (no future corrosion allowance) in to get the 112 psig (I get 122 psig using 20% of 0.375 in, but I assume that the wall thickness isn't exactly 20%). Most companies have a maximum ratio of calculated stress to SMYS, and the number is often around 20%, so if you put that number (say 20% of SMYS, which I'll assume is 42,000 psi) and a 2/64 corrosion allowance I get a new MAWP of 25 psig.

For this kind of problem the answer really doesn't matter (a wide range of answers are all pretty much supportable), the important thing is that you pick a method, document it, and follow it. If you use 100% of SMYS and no corrosion allowance you should put steps in place to never go above your 112 psig (ESD, PSV, pump kills, etc). Then if the pipe does fail you have an Engineering basis for having selected the wrong MAWP ("wrong" being defined as a pressure where the pipe failed anyway).

David Simpson, PE
MuleShoe Engineering

"Belief" is the acceptance of an hypotheses in the absence of data.
"Prejudice" is having an opinion not supported by the preponderance of the data.
"Knowledge" is only found through the accumulation and analysis of data.

RE: 30" dia oil pipeline derating

ASME B31G
Describes one method for determining the remaining strength of corroded pipelines.
https://law.resource.org/pub/us/cfr/ibr/002/asme.b...

"People will work for you with blood and sweat and tears if they work for what they believe in......" - Simon Sinek

RE: 30" dia oil pipeline derating

(OP)
Hi David,
Here is correct information, piping class is API5L X52 and MAWP with out Corrosion allowance is 137 PSIG, MAWP method is given in API 579.
C/A 2/64 i can't understand it because menon does not discuss about it, can you please explain bit more.
Thanks
10815L

RE: 30" dia oil pipeline derating

How accurately do you know your existing corrosion condition and thus "max lost wall thickness"?

For example, it sounds like you've surveyed it pretty closely, or you would not be pulling it out of service, but how much margin do you "need" in today's enviro-regulatory-attitude to risk a break and lost oil? Is there a significant probability some part of the pipe might be pitted twice as deep as the "normal" parts you have measured?

As pointed out above, your failure point will be at the place where current corrosion is high enough, and new local stresses high enough, that otherwise sound metal around the initial failure also rupture.

RE: 30" dia oil pipeline derating

(OP)
Sir,
our inspection department used smart piging for thickness servey and they have give these values, the line is runing through desert area in north african country.
I want your input for fitness of this line because right now no plan to replace it. may be infutre if this line brust three / four points and lost tons of oil then may think to replace it.
Thanks
10815L

RE: 30" dia oil pipeline derating

Will you at least plese read B31G.

"People will work for you with blood and sweat and tears if they work for what they believe in......" - Simon Sinek

RE: 30" dia oil pipeline derating

Correction ... B31G latest edition is 2012. (Do not know how to edit a previous post) Last one I have access to is 2009.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources