INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

2 Hr. Fire rated paint storage room

2 Hr. Fire rated paint storage room

2 Hr. Fire rated paint storage room

(OP)
Could some one help clarify 2 hr fire rated drywall. It is an existing room that will be used for storing paint in. It currently has 1/2" drywall interior and 3/8" t1-11 on the exterior of one wall for this room. Can 2 shhets of 5/8" be applied over top of the t1-11 or will it need removed? Also ventilation is a requirement and I am being told it does not have to be continuos but I believe osha says it must?
Thanx,

RE: 2 Hr. Fire rated paint storage room

The requirements are in the IBC/IFC. OSHA has requirements, but these depend upon what exactly the nature of the materials are. You say paint, but is it flammable, or is ventilation required for other reasons (such as toxicity)? If the materials are flammable, there are limits on quantities in each room. There will also be requirements for sprinklers and controlling the runoff from these and fire department hoses. There are also requirements for at least two exits, spaced not greater than 1/2 the longest diagonal dimension of the room for hazardous occupancies, up to a maximum egress distance. Some installations also require that doors open to the outside of the building. IBC and OSHA requirements also depend upon whether it is closed container storage or the room is also used for dispensing (transferring materials from one container to another.) See IBC 2012 section 414, for some requirements.

A fire protection engineer or safety engineer will be able to answer these questions with specificity. This is something which requires proper analysis and assessment.

RE: 2 Hr. Fire rated paint storage room

(OP)
Thank you we are including some specific engineering into this project.

RE: 2 Hr. Fire rated paint storage room

TX has it right

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources