INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pressure Relief Valve Devices Frequency

Pressure Relief Valve Devices Frequency

Pressure Relief Valve Devices Frequency

(OP)
Hi Guys

I have been given the task to come up with a strategy for overhauling Relief Valve devices (PRV, TRV ect.) for a LNG facility. I have located and read the relevant regulations and guides in relations to setting the frequency period, however I am having some trouble applying it my situation

- this is a new facility - so I have no operational history
- regulations state that the max period is 5 years

So my question is, how do you break this down? Do you set a frequency period for each type of device or do you set the frequency period in regards to where it is located i.e LNG train, LNG storage ect.


Thanks!

RE: Pressure Relief Valve Devices Frequency

The service fluid is the main factor affecting the service interval. Valves in corrosive, dirty, and fouling services need to be PM'ed more frequently than valves in clean non-corrosive services (such as LNG).

I don't think there are any prescriptive requirements that constrain this initial inspection interval decision. Different companies have different internal practices. Personally, I think it's appropriate to leverage experience from similar services, even if they're at a different facility. There's no right or wrong answer. Consult with maintenance and/or process safety personnel within the company, and make a decision that's consistent with corporate risk tolerance.

RE: Pressure Relief Valve Devices Frequency

(OP)
Thank you for your reply, do you have any experience in regards to offshore rigs
do they send their relief valves onshore to be tested/overhauled or do they do it on the offshore rig?

RE: Pressure Relief Valve Devices Frequency

I'd supprised if they overhaul PRV's on any rig. That requires a "VR" Code stamp. The most that most refinerys do is to "Pop Test" them. Good Pop = reinstall. Bad Pop = send it to a VR Shop. Reasonable presumption that this would be the most that would be done on a rig, considering that it might be 10% the size of a small refinery.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources