I'm looking for the right live design loads per OSHA for designing walkway ans platform for industrial site.
there are sevel rate,40 60, 100 psf, I'm confused and I like to be sure to use the good rate with OSHA reference.
could you help please.
Thanks.
Laurent.
I'm looking for the right live design loads per OSHA for designing walkway ans platform for industrial site.
there are sevel rate,40 60, 100 psf, I'm confused and I like to be sure to use the good rate with OSHA reference.
could you help please.
Thanks.
Laurent.






RE: walkway and elevated platform for industrial equipments
Depending on the location and circumstances, local building codes may mandate loading also.