INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Terzaghi & Peck, multlayer soil

Terzaghi & Peck, multlayer soil

Terzaghi & Peck, multlayer soil

(OP)
hi,

how do I use T&P emperical equation when there are different soils within the trench, say a sand on top of a clay. Also, water table is halfway down, and will be dewatered, so I'll have water pressure on bottom half of braced excavation.

Thanks

RE: Terzaghi & Peck, multlayer soil

What emperical equation from T&P?

You need to give us some context to have a chance of getting some help.

Mike Lambert

RE: Terzaghi & Peck, multlayer soil

(OP)
thanks for reply, sorry about that. I'm referring to the one for uniform lateral soil pressure distribution in a braced excavation. .65*ka*gamma*H. Thanks again.

RE: Terzaghi & Peck, multlayer soil

You will need to develop a pressure diagram based on the soils and your experience.

I usually, figure the K0 pressure for reference for each soil type, then develope a pressure diagram using T&P to develope the shape for each soil.

A lot depends on how stiff a system you are designing. If the system is fairly flexible, then pressures will be K0 or less. If the system is very stiff and the struts are heavily preloaded, the apparent pressure diagram can be higher than that given by K0 pressures.

In other words, it get complicated and you have to develope the apparent pressure diagram based on how you think the system will be constructed and how stiff a system you need. If movement sensitive imporvements are nearby, then a very stiff system is needed which results in a much higher apparent pressure diagram.

Hope this helps some.

Mike Lambert

RE: Terzaghi & Peck, multlayer soil

give it to a soils engineer and let them prepare the diagram for you including surcharge at the top.
then you both can focus on how stiff to make the support system to limit movements nearby like mike says.

RE: Terzaghi & Peck, multlayer soil

Braced excavations typically are for short-term loading conditions - i.e., just to facilitate construction. If you are dewatering for construction, then I'm not sure how the water table factors into this analysis.

The T&P equations for braced excavations are different for cohesive and granular soils. You have both. However, in both cases the area of the load v. depth (integral with depth) is 30 percent greater than the integral of the Rankine active earth pressure. If this were my responsibility, I'd determine the Rankine force for the upper layer, multiply it by 1.3 and then form the rectangle. I'd do the same thing for the lower soil.

Actually, as a design engineer, I'd leave the whole mess to the contractor, 'cause it's the contractor that owns temporary shoring. (That is unless you are working for the contractor. . .)

f-d

¡papá gordo ain’t no madre flaca!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources