INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

verfy an existing plant

verfy an existing plant

verfy an existing plant

(OP)
Good morning sirs,

I was asked to verify (with calculations) if an existing VOC air stripper (never run and still not complete) unit is capable to run with a new water flowrate and composition. The polluted water is sent to an air stripper, then the rich air is sent to an adsorber - rigenerator unit and then to charcoal filters before going to the atmosphere.

Moreover I've been asked to model the entire system with a process simulator for a sensitivity analysis. I have PFD's, P&ID's, an Operating manual and several datasheets and supply specs.

How would you proceed for the two phases? Would you use the simulator to verify the plant or you would verify piece by piece the equipments and then set up the simulation?


Thank you in advance


Alessio

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources