INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Replacing Bridge (under Canadian Code - CAN-CSA S6-06)

Replacing Bridge (under Canadian Code - CAN-CSA S6-06)

Replacing Bridge (under Canadian Code - CAN-CSA S6-06)

(OP)
Hello,

I have to replace a 50 year-old bridge. Only the superstructure will be replace (not abutments). Since this is a new bridge I have to use the current code (CAN-CSA S6-06; this is in Ontario, Canada) which requires the bridge to be designed for a CL-625-ONT, which is over three times higher than the load original used for the old bridge. I most likely have the risk that the abutments will not take the new load. Does anyone one if there is any provision that allows for design a new bridge based on the fact that the abutments do not need replacement an therefore they will call for the critical bridge load?

RE: Replacing Bridge (under Canadian Code - CAN-CSA S6-06)

Can you use Part 11 of the Ontario Building Code? or is it excluded for bridges?

Dik

RE: Replacing Bridge (under Canadian Code - CAN-CSA S6-06)

With new steel, you'll have new bearing pads that may allow to spread of the loads on the existing abutments, otherwise, abutments may have to be beefed up(which I have not seen done in 15 years of bridge construction in Ct.) or replaced which I have seen done when replacing old bridges.

RE: Replacing Bridge (under Canadian Code - CAN-CSA S6-06)

(OP)
Thank you guys, under clause 3.8.3.1 of CSA S6-06, I am allowed to lower the load based on traffic conditions. I will design using the old load given that the traffic will not change (this is certified by tyhe owner of the bridge); so I am still good with the abutments.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources