INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Break-out-Flanges or Break Flanges

Break-out-Flanges or Break Flanges

Break-out-Flanges or Break Flanges

(OP)
1) Break-out-Flanges or Break Flanges: I am required to check if design considers "Break-out-Flanges or Break Flanges" for hydrotest. Appreciate information on Break-out-Flanges or Break Flanges.
Previous thread Ref: http://www.eng-tips.com/viewthread.cfm?qid=302062#...

2) Spec break : In your opinion the location of spec break be advised in P&ID?

RE: Break-out-Flanges or Break Flanges

I'm not sure what is meant by break flanges for hydrotest. If you had a system that was welded with a pressure spec break, I could see installing a set of flanges to allow the high pressure and low pressure systems to be independently hydrotested. In fact, in this case, the high pressure/low pressure spec break would occur at this set of flanges rather than at the outlet of the high pressure valve as is typically done.

Spec breaks be it between piping specifications, insulated and non-insulated systems, heat tracing and non-heat traced systems and perhaps things like stress relieving or PWHT should be shown on the P&ID as the process engineer has to make those decisions when the P&ID are initially created. Without those specification breaks, piping can not start detailed design (those are not decisions IMO piping should be making). PWHT can be handled by spec breaks (SR/non-SR) or by pipe spec breaks where one pipe spec is stress relieved while another pipe spec which is identical to the first except for not being stress relieved. I've seen both done.

RE: Break-out-Flanges or Break Flanges

As a constructor, and often working with engineering in the upfront design, we have directed the placement of the flanged connection in piping systems when it is desireable to test one side of the flange pair at different pressures. I think the system engineer would always then show the flange pair on the P&ID, for routing/modeling by the designer. If the design pressure is different on each side of the flange pair, then this would typically mean either side of the flange pair is under a different spec, thus, a spec break at the flanges.

RE: Break-out-Flanges or Break Flanges

But note that the flange (on the low pressure side of the spec break) might thus be "over-rated" for its service, just to be thick enough to match the higher pressure side (bolt hole size and spacing and RF diameter).

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.