INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PACKER (OR SHIM) REDUCTION FACTOR, DOUBLE-LAP SHEAR BOLTED JOINT

PACKER (OR SHIM) REDUCTION FACTOR, DOUBLE-LAP SHEAR BOLTED JOINT

PACKER (OR SHIM) REDUCTION FACTOR, DOUBLE-LAP SHEAR BOLTED JOINT

(OP)
Fellow Stress Engineers:

I am familiar with a couple of methods for calculating the strength reduction factor arising from packers (shims) in single-lap joints. Presently I am working a concession in which a packer is to be fitted on one side of a double-lap joint. Does anyone know of a method (or adaptation) covering such a case?

Thanks in anticipation.

RE: PACKER (OR SHIM) REDUCTION FACTOR, DOUBLE-LAP SHEAR BOLTED JOINT

why not say (for the point of argument) that 1/2 the load goes down one side of the dble shear joint and 1/2 down the other (ie treat as two single shear joints) ?

RE: PACKER (OR SHIM) REDUCTION FACTOR, DOUBLE-LAP SHEAR BOLTED JOINT

ahhhh ... i hope you we're counting on a dbl shear allowable; reducing the middle layer like that will probably make the joint critical in bearing in the middle layer !

i guess you could either ...

1) look at the overal free body ... if you're going to have simple reactions then that'll dictate the loads, or

2) have the unpacked (stiffer, due to the shorter off-set) side react 2/3rds; but then what'll that do to the overall balance ?

this is i think different from typical packer reapairs, in that the problem with adding packers is that you increase the off-set, increasing bedning in the fasteners.
your repair doesn't look like this, it looks like you've had to repair the middle layer for some reason; you havn't increased the off-sets, but you have reduced the bearing capacity of the middle layer.

RE: PACKER (OR SHIM) REDUCTION FACTOR, DOUBLE-LAP SHEAR BOLTED JOINT

(OP)
Thanks again, rb1957.

The subject area is part of a joint made up of 34 fasteners along a curve. Those affected are in the 22nd to 25th positions. I have made the pessimistic assumption that the fasteners in-way-of the packer are ineffective and that their loads are taken by the immediately adjacent bolts, fwd & aft. I have been able to show it good on this basis.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources