INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

exceeding top concrete cover

exceeding top concrete cover

exceeding top concrete cover

(OP)
what will you do if found pedestal with top concrete cover say about 120 mm (while the design state that concrete cover 50mm) ? This condition raise after do core drill to take a sample..

RE: exceeding top concrete cover

It depends. A picture would help. What do you mean by a "pedestal"? What is the function of the reinforcement?

RE: exceeding top concrete cover

Two issues with that. The anchor bolts will have reduced development length with the pedestal verticals, and the top of the pedestal is unreinforced for lateral forces imparted by the column base. Whether or not this creates an unsatisfactory condition depends on the forces involved.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources