INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Perma Jack System

Perma Jack System

Perma Jack System

(OP)
I am investigating a house in Central Texas built in 1959 with a slab on expansive clays. Over time the house settled down towards one corner as much as 7 inches. The owner installed hydraulically driven steel piers (Perma Jack system) around the perimeter to stabilize the foundation roughly twenty years ago and did not raise the slab at all (most likely did not want to do the interior piers). Recent investigation has shown no further movement. The new owner is interested in raising the slab to make the house level and this will mean interior piers.

Does anyone have experience with the Perma Jack system or driven steel piers? I'm curious if the existing 20-year-old system can still be utilized to raise the slab and if a differential of 7 inches from one corner to the other is a concern, even with installing interior piers at 7 to 8 foot spacing. Or should they scrap the existing system and go with an entirely new plan?

Thanks for your time.

RE: Perma Jack System

Many of those systems work about the same. Drive pile to resistance - hook to footing and push back in place.

What scares me is the 7'' difference. Your walls must be way out whack and may have been patched. Pushing this back in place is going to cause a WHOLE new set of problems and repairs.

Good Luck.

RE: Perma Jack System

How deep (massive) is the expansive clay at this site? How deep did the steel pipe piles get pushed (hydraulic)? Or where they actually driven (percussion)? This type of system is only designed to resist future settlement (from clay shrinkage or compression) and not heave. Subsequent heave can still occur and if the house was not re-leveled, which would create some minor void near perimeter to permit possible accommodation of some clay heave, then subsequent clay swelling would easily lift the house. Heaving could occur in the central area as well where no re-leveling was performed. Was the 7 inches measured before the steel pipe piles were installed? If yes then i assume the perma jack contractor performed some re-leveling. Perform a slab survey now to measure current elevations. Mike is correct, you cannot re-level 7 inches, you will surely cause damage. I practice in Central Texas and can tell you the only foundation repair system i endorse is drilled piers. They can be installed with portable equipment for confined areas typical of urban homes. The steel pipe piles can only work if properly engineered and installed.

Nick

RE: Perma Jack System

Question:
How is under slab plumbing effected or stabilized, when you move a mono slab this much?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources