Previous codes have had Wood Structural Panel Diaphragm allowables for nails based on spacing and blocking. In the new 2012 IBC I am only seeing values for staples in Table2306.2(1). Does anyone know what's going on? Did they pull the nailing allowables out and is there a different reference now to get these values from? Maybe in the newest NDS? Thanks for any input.






RE: 2012 IBC Wood Structural Panel Diaphragms
Garth Dreger PE - AZ Phoenix area
As EOR's we should take the responsibility to design our structures to support the components we allow in our design per that industry standards.
RE: 2012 IBC Wood Structural Panel Diaphragms
The years maybe incorrect but yes, 2012 IBC defers to the NDS now.
PE, SE
Eastern United States
"If a builder builds a house for someone, and does not construct it properly, and the house which he built falls in and kills its owner, then that builder shall be put to death!"
~Code of Hammurabi
RE: 2012 IBC Wood Structural Panel Diaphragms
RE: 2012 IBC Wood Structural Panel Diaphragms
Mike McCann
MMC Engineering
http://mmcengineering.tripod.com
RE: 2012 IBC Wood Structural Panel Diaphragms