INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Shunt Reactor & Teaser Reactor

Shunt Reactor & Teaser Reactor

Shunt Reactor & Teaser Reactor

(OP)
Hi guys,

I would like to ask how you guys pick right rating for teaser reactor based on the shunt reactor ratings ?
May someone can enlighten me the explanation for shunt reactor & teaser reactor ?

I'm first time see the equipment drawing, not much electrical technical background, and given task to check whether it can be compatible on the substation system.


Regards,
Linspire

RE: Shunt Reactor & Teaser Reactor

See: ABB PROTECTION APPLICATION HANDBOOK
Network General
ch.7 REACTORS FOR EXTINCTION OF SECONDARY ARC AT AUTO-RECLOSING.

RE: Shunt Reactor & Teaser Reactor

(OP)
I found it, thank you~ is it possible the shunt reactor weight is around 12 tons ?

RE: Shunt Reactor & Teaser Reactor

Of course it depends on voltage and power ratings, but 12 tons is not unreasonable for a shunt reactor used for voltage/var control. 12 tons sounds too big for a teaser reactor.

RE: Shunt Reactor & Teaser Reactor

Weight of 12 Tonnes may be reasonable for a teasor reactor used at the neutral of a 400 KV 3 phase shunt reactor. Similar single phase reactor of 400 ohms weighed 7 tonnes.

RE: Shunt Reactor & Teaser Reactor

(OP)
Is there any technical particular & guarantee for teaser reactor that I should take note ?

According 7anoter4, the ABB handbook, does not state clearly how calculate / design the teaser reactor ?
My shunt reactor rating was 5 MVAR 275kV/(root(3).

Is there any important need to take note in term of maintenance for teaser reactor ?

RE: Shunt Reactor & Teaser Reactor

(OP)
Another question is, why manufacturer submit a higher voltage rating for Type Test report for shunt reactor ?
Is it acceptable ? They submit 420kV shunt reactor instead of 275 kV/ (root (3))

RE: Shunt Reactor & Teaser Reactor

I would go back to the manufacturer. The reactance is measured at rated voltage, if you arent running it at rated voltage then you won't get the rated MVAr.

Also a good idea to check the rating plate vs the type test certificate, they may have made an error in authoring the cert.

Or you are looking at withstand voltage instead of rated operating voltage?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources