INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Strand7 Time delay of multiple forces

Strand7 Time delay of multiple forces

Strand7 Time delay of multiple forces

(OP)
I'm trying simulate 6 forces of equal magnitude impacting a row of consectuve beams, each 1 second apart (ie like a truck impacting cross beams along the length of a bridge). I am restricted to using Strand 7, is it possible to individually delay each force in a dynamic analysis? Or is there a similar work around?

Appreciate any info, thanks!
Cam

RE: Strand7 Time delay of multiple forces

Define the loads in different loadcases, then you can factor them all independently.

Doug Jenkins
Interactive Design Services
http://newtonexcelbach.wordpress.com/

RE: Strand7 Time delay of multiple forces

Doug is right but possibly a little succinct.

In a linear structure you can add the effect of each force. So you ca add the stresses due to a force at node 1 to the stresees due to the force at node 2 with the appropriate tiem delay.

Cheers

Greg Locock


New here? Try reading these, they might help FAQ731-376: Eng-Tips.com Forum Policies http://eng-tips.com/market.cfm?

RE: Strand7 Time delay of multiple forces

To be a little less succinct, in Strand7, in both the linear and non-linear transient dynamic solvers you can define "Load Tables" which allow you to apply different "time tables" to each load case, so each load can be factored independently over time, which should allow you to do what you want.

Doug Jenkins
Interactive Design Services
http://newtonexcelbach.wordpress.com/

RE: Strand7 Time delay of multiple forces

(OP)
Thats a great help from all, thank you! I'll try this out tomorrow.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources