INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Doweling Concrete Joints

Doweling Concrete Joints

Doweling Concrete Joints

(OP)
I desire to dowel the concrete joints for a 10" thick concrete pavement for a transfer station. The trucks will be running in multiple directions throughout the lot, and the pavement will need to be poured in sections in various directions. Unlike a road where there is a longitudinal tie joint and transverse joints, I would like to dowel the concrete along all joint directions the same as there is multiple traffic patterns throughtout the lot. The lot will need to be done in at least 4-5 pours to maintain the use of the lot.

1. Can the contractor form along the proposed joints and set dowel inserts along the edge of the form to enable future insert of the dowel? How is this best done? Also due to the thickness, should I provide a keyway between the pours?

2. I often see concrete joints in new construction terminate perpendicular to the curbing to enable saw cutting the curb with the pavement. Is this necessary for the new pavement where it will terminate along existing concrete since there will be an expansion joint?

3. There is an existing fuel island in the middle of the lot set on a concrete pad. Some of this concrete is cracked. What is preferred manner to terminate along this existing concrete? Should I drill and set new dowels, pour a thickened slab and have an isolation joint? What is recommended at this location.

4. There is a lot to match and I did the best I could with the joint plan. Any suggestions? Slabs range from 12.5' to 15' max.




Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources