INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HS25 Impact Loading

HS25 Impact Loading

HS25 Impact Loading

(OP)
Question on the required 22.5 Kip (for moment) point load for HS25...

Does impact loading have to be added to this per AASHTO? I don't have a current copy and can find no reference to this. If so, I would expect 30%.

Designing steel grate for a vault lid and it comes into play here.

Mike McCann
MMC Engineering
http://mmcengineering.tripod.com

RE: HS25 Impact Loading

yes, it's applied to the uniform and the concentrated load. Don't have an AASHTO in front of me but I can look for the citation next week.

RE: HS25 Impact Loading

(OP)
Thanks BB. If you could post that reference early next week, I would really appreciate it.

Mike McCann
MMC Engineering
http://mmcengineering.tripod.com

RE: HS25 Impact Loading

no problem Mike

RE: HS25 Impact Loading

AASHTO Standard Specs (17th & final ed.) Section 3.8.1 states that impact will be applied to the highway loading. The highway loading is defined in 3.7.6, which is the truck or equivalent lane load.

RE: HS25 Impact Loading

Are you sure you can use the standard specs on this project? I think fhwa requires use of lrfd provisions of AASHTO if there is any federal funding involved...could be wrong though, and it may not apply to this type of work anyway. The lrfd provisions for impact have increased to 33%, but it is applied only to the truck load. Live load provisions have changed too. The point loads were removed and you now apply both the truck load and the lane load concurrently.

RE: HS25 Impact Loading

HS25 implies Standard Specs, whereas LRFD would be HL-93.

RE: HS25 Impact Loading

(OP)
Thanks again BB. If I could give you a second star, I would.

It's one of those situations where the supplier says that he has done it this way for years with no problems, if you know what I mean. The documented references will help immensely.

Mike McCann
MMC Engineering
http://mmcengineering.tripod.com

RE: HS25 Impact Loading

Thanks for star Mike. I know what you mean. I had a similar experience some years ago dealing with a staircase designer/manufacturer.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources