Lining under a mining rockfill waste stockpile
Lining under a mining rockfill waste stockpile
(OP)
1. As a consulting engineer what are the main parameetrs to check for lining in product specifications to choose between various available producers.
2. How important is the "elongation to break" criteria for the lining design. What are typical values?