INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

title block description and revision control

title block description and revision control

title block description and revision control

(OP)
Hello,

Do you need to change the revision of a part if the only thing to change on the drawing is the item description?

Nothing changed except for what we call it internally.

Thanks,
Reg

RE: title block description and revision control

The change should be noted in some fashion. I've worked in companies where we have called them 'none' changes and used 'none' in the revision block with the description of the change (i.e. corrected spelling from 'detial A' to 'detail A'; revised title from 'Shim' to 'Spacer'). There would be no official notification of the drawing change - a vendor could have revision C without the subsequent 'none' change or could have revision C with the 'none' change. This worked 'ok' until an engineer 'forgets' wht he is doing and in addition to making the innocuous change makes a physical change to the part and then all hell breaks loose. The goof-proof way of doing this is to revise the part.

RE: title block description and revision control

Bottom line: Just be consistent. Have a policy and follow it. My slight preference is to revise it as you would with respect to any interchangable change if you must change it. But resist making such changes at all. Changes are dangerous and cost money...

Peter Truitt
Minnesota

RE: title block description and revision control

I would say YES! Once a Drawing is in a released state and in circulation, if the drawing is revised for any reason and the change is not documented, how would one know what the proper version of the drawing is? If audited how would you defend the change? How could you easily prove that the only change made was in the Title Block with out a complete drawing check? If a practice like this is followed, what stops anyone from making changes and not documenting it? Today it's a part description, tomorrow someone makes a tolerance change and no one notices. The part gets made and does not meet print. What then? Just food for thought.

RE: title block description and revision control

Consider the OP "...change the revision of a part...". Most documentation experts say that documents have revisions and parts do not. The distinction is very, very important. But even experts goof up the teminology sometimes. For instance, Frank Watts goofed up on page 30 of his "Engineering Documentation Control Handbook" (Third edition)in the first full paragraph. He agreed with me that it was misstated when I contacted him.

Peter Truitt
Minnesota

RE: title block description and revision control

(OP)
Thank you all for the feedback. Change the rev it is!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources