INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Shear friction dowel action

Shear friction dowel action

Shear friction dowel action

(OP)
Question: Per ACI R11.7.4.3, one can use mu=0.6 for shear resistance primarily due to dowel action of the reinforcement. Does the reinforcement still need to be developed on both sides? Is the 0.6 basically saying the dowels will be shearing (not in tension)?

Background: (See attached sketch) We have our typical housekeeping pad detail 6" tall concrete pad with #5 dowels w/ std hooks around the perimeter and a mat of #5's. We do have lateral load from equipment mounted above that needs to be transferred thru the pad into the foundation. My argument is that even if you used #3 dowels in our typical 6" pad, you cannot get ldh in the pad, thus you cannot develop the dowel, thus you cannot use shear friction. On the other hand, if you count on just the bars shearing (is that even valid), then you might get into side cover blowout appendix D issues...

Any thoughts, references, threads? Thanks in advance.

RE: Shear friction dowel action

I have always wondered about this myself. It seems that with mu=0.6 there is no need to develop the full tension force in the bar. I would think calculating an Appendix D type blowout if less than ldh is reasonable and defensible from an engineering standpoint.

You can always reduce the force by the actual development length / ldh

RE: Shear friction dowel action

You might be correct that it is dowel action and therefore not so dependent upon the anchorage of the rebar on either side of the crack/plane but the shear friction method in 11.7 doesn't specifically recognize this and the commentary doesn't suggest you can do this.

So it appears that if you are designing within 11.7, you have to develop fy. Otherwise you head over to Appendix D.

RE: Shear friction dowel action

(OP)
Thanks JAE, that was basically my thoughts too. "Otherwise yuo head over to Appendix D"... I cringe at the thought!

RE: Shear friction dowel action

Another option is to provide mechanical anchorage at the bend of the dowel, i.e. weld to a cross bar.

BA

RE: Shear friction dowel action

Why not place some more dowels internal to the plinth? I don't think this application is what is intended for "shear friction" design.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources