INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Estimated cost of AC equipment for large scale PV design

Estimated cost of AC equipment for large scale PV design

Estimated cost of AC equipment for large scale PV design

(OP)

I am involved with a large Utility Scale PV system design which will include connecting an 100MW PV farm into the utility system.

I currently need to come up with an "Ballpark" equipment cost estimate for the equipment that will be required on the AC side of the inverter to connects the system onto the utility grid. Without looking too much into the potential AC design I was wondering if there was an estimated $/MW cost estimate that could be used to estiamte the cost of the AC equipment on a large scale PV system. This cost estimate would inlude all hardware necessary for construction of the system.

Has anyone seen a cost estimate figure or have experience with this?

Thanks for the help.

RE: Estimated cost of AC equipment for large scale PV design

Try the report "Residential, Commercial, and Utility-Scale Photovoltaic (PV) System Prices in the United States: Current Drivers and Cost-Reduction Opportunities," from February 2012. It looks like it's less than 1% of the 3.80 - 4.40 $/Wdc cost for permitting and commissioning costs, and the report says they lumped substation costs into that category. You might be able to get a better number for substation estimate only if you contact the authors at NREL.

xnuke
"Live and act within the limit of your knowledge and keep expanding it to the limit of your life." Ayn Rand, Atlas Shrugged.
Please see FAQ731-376: Eng-Tips.com Forum Policies for tips on how to make the best use of Eng-Tips.

RE: Estimated cost of AC equipment for large scale PV design

you should begin by talking to the power engineers at the utility company that you plan to connect with.
they will tell you what you must use.
sounds as though you are a bit out of your depth here my friend.

really a 100MW system?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources