INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Mooring on hard soil

Mooring on hard soil

Mooring on hard soil

(OP)
We need to propose best anchoring method for dredging vessel in a location where sea bed is mostly dense sand (calcareous). Maximum required holding capacity of the anchor is 1200 KN .In the past experience, Stevshark anchors were difficult to be placed in the project location due to lack of penetration. Can we propose a pile anchor in such a location ?

RE: Mooring on hard soil

Calcerous sand can get very, very hard. At times as hard as cement. I don't think hammered piles will be productive. I don't know if a vibrated pile will work either, or if you will be forced to drill and push. This is the only thing I have on sea anchors. They suggest vibratory piles for dense sand, but I think that if the calcium is hardened, it will not work. Drilling it in may be your best bet.

If it ain't broke, don't fix it. If it's not safe ... make it that way.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources