INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bus Station at Grade

Bus Station at Grade

Bus Station at Grade

(OP)
Am designing a Bus Rapid Transit (BRT) Corridor (20km long) with Bus lanes at the median of the existing dual carriageway road,the bus stations are also located in the median. The Bus station drawings were prepared at flat grade by the architects but my road profile have a longitudinal grade of 0.7% to 2% if i try to flatten the road at station locations it brings drainage problems as the station becomes submerged on one side (see the attachment)my question is can i put the station at grade say (0.7% to 2%)? Any suggestion is appreciated

RE: Bus Station at Grade

Sure, why not? The architect needs to think in three dimensions.

RE: Bus Station at Grade

2% or less shouldn't inconvenience pedestrians. Is it enough that the walls will be noticibly out of plumb if you don't adjust the design?

RE: Bus Station at Grade

If drainage is that close, I would increase the foundation wall height to accommodate both the drainage issue and the "wedge" shape relative to the pavement grade. You will probably have a step or two to take up the additional height, but shouldn't be an issue as long as handicap accessibility can be accommodated.

RE: Bus Station at Grade

(OP)
The bus station platform is raised 1m above the pavement to enable boarding on same level (See the attachment)thus the platform must remain parallel with the pavement. the station have automatic sliding doors so if the station is at grade the columns& walls have to be out of plumb for the doors to function properly, I want to know if it will be technically ok to put the station at grade.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources