Smart questions
Smart answers
Smart people
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Member Login

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips now!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

Join Eng-Tips
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

LINK TO THIS FORUM!

Add Stickiness To Your Site By Linking To This Professionally Managed Technical Forum.
Just copy and paste the
code below into your site.

Partner With Us!

"Best Of Breed" Forums Add Stickiness To Your Site
Partner Button
(Download This Button Today!)

Feedback

"...This has been the MOST helpful forum that I have been a part of and I want to say thank you. The tips, tricks and helpful advice that you all contribute to have been lifesavers in many instances..."

Geography

Where in the world do Eng-Tips members come from?
CroninD (Mechanical)
30 Jul 12 6:36
Hi guys,

Relatively new to GD&T. I have a base plate in an assembly with two counterbored slots in it. I know how to geometrically tolerance a normal UN-counterbored slot; i.e;
Link

How do I go about it if the slot is counterbored from the underside to give clearance for a socket head cap screw? Is it the same as dimensioning a counterbored hole minus the diameter symbol? Or should i tolerance the top and counterbored sides seperately?

Any help is much appreciated.

D.
KENAT (Mechanical)
30 Jul 12 15:39
I'd probably tolerance/dimension as two 'coincident' slots where one of them has a depth associated. I'd probably dimension the depth in a section view just to make clear.

If using position & envelope principle to locate the slots I think this should work OK and minimize chance of confusion.

Posting guidelines FAQ731-376: Eng-Tips.com Forum Policies http://eng-tips.com/market.cfm? (probably not aimed specifically at you)
What is Engineering anyway: FAQ1088-1484: In layman terms, what is "engineering"?

CheckerRon (Mechanical)
30 Jul 12 15:42
I've done this before and there is a couple ways. You can dimension the slot and the counterbore slot to the same datums each having it's own FCF and maybe a relaxed tolerance on the counterbore, or you can positional tolerance the slot a per the standard and give it a datum, say D. then tolerance the counterbore slots to datum D, "4X INDIVIDUALLY" (or however many there are).

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close