INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

(OP)
Dear All,

Please clarify me whether the PWHT(Post Weld Heat treatment) is required to be done for welding a 25mm thick plate to a hanger rod of dia 80mm which is at the temperature of around 400 deg. carrying a load of 10 tons.

Also please let me know in which code these requirements are mentioned.

thanks

RE: REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

Impossible to answer because we are not mind readers -

1. What are the materials of construction? Not just carbon steel or alloy steel, the composition of the materials or material specification are required.
2. What is the application for service?
3. What are the weld attachment details?

RE: REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

Usually, welds would follow a qualified weld procedure and be performed in accordance with some welding code, and that procedure and code would dictate if PWHT were required. That could be various sections of the ASME code, could be the Structural Welding Code, could be various other US or foreign codes.

RE: REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

(OP)
sorry, i didn't know much about PWHT REQUIREMENTS,
Actually we want to weld a a36 material plate with sa105 material rod.using a full penetration bevel weld .
it is used for non-pressure part structural load carrying purpose.

RE: REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

For this material thickness and application, I would perform PWHT at 1100-1150 deg F for 1 hour, slow cool. Welding should be performed with 200 deg F preheat.

RE: REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

There are thousadns of manway davit, which is supported by a carbon steel clip welded to the flange. The clip can be as thick as you want, depending on the load. This is similar to your case, and we follow code Table UCS-56. We use full penetration weld, so if the total clip thickness below 1.25", no heat treatment. In your case, you do not need PWHT.

RE: REQUIREMENT OF PWHT FOR WELDING A PLATE WITH ROD

No PWHT is required. Only preheat is neccesary: please see AWS D1.1

Regards

rhg

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources