INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

(OP)
I have a retrofit addition to a commercial building in Southern California that has been in place since 2000 where we are adding load to a TS columnn/pad footing which causes the soil bearing allowable to go to 2092 psf. The footing was originally designed with the '97 UBC/CBC permitted SB allowable of 2000 psf without a soils report, so no soils report was ever done. Both footing and TS column calc out great otherwise. Building shows no signs of settlement anywhere and there are no indicators of soil concerns (such as moisture, drainage, fill, etc.) anywhere on the site. This footing is on the interior of the building under a concrete slab floor and would cause significant disruption of use to underpin. I'd hate to tell my client he has to initiate a soils investigation for this small of an overload (+4.6%). My gut tells me that it will be just fine, that the actual soil bearing capacity is in excess of 2092 psf, but I suspect I should show up with something better than that for a plan check at the building department. Is there any kind of geotechnical basis for the benefit of soil compaction under existing construction that has been in place that long with no problems? I'd be much happier to be able to reference something technical if anything exists. Any help would be greatly appreciated.

RE: Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

I don't know about in California, but where I have worked, it would be a no brainer. Just move on to something more important. But what does "TS" mean?

RE: Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

(OP)
In the absence of any brilliant technical references, that's just what I'll do.

TS is the old notation for structural Tube Steel, what is now called rectangular HSS.

RE: Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

I think hokie66 just provided that "brilliant technical reference"...I agree. lol

RE: Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

Your conclusion in your calculation should say, "2092 psf OK vs. 2000 psf allowable per hokie66."
Soil allowables are among the most mysterious, magical numbers we use in engineering. It's not worth getting too precise with them. Your 5% overage vs. this mandated allowable is not an issue.

RE: Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

(OP)
Thanks all!

RE: Any solid technical basis for exceeding the default SB allowable for footing in place for 12 years?

Brings to mind an old saw....

Measure it with a micrometer
Mark it with a crayon
Cut it with an ax

Bearing capacity of soils is just as JC described....magical mystery. Most geotechs will tell you their numbers have a FS>3 on such.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources