INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete Column Cm factor

Concrete Column Cm factor

Concrete Column Cm factor

(OP)
If I have a concrete column (non-sway) that I am checking for axial load only (no moments- M1 = 0, M2 = 0) but is tall enough to warrant the slenderness check, what would the Cm factor be? Would it be 0.6 or 1.0?

RE: Concrete Column Cm factor

You will have moments.... based on the M2,minimum equations. Based on those code provisions, you can probably extrapolate it out so that M1/M2 = 0 and you'd have a Cm of 0.6.

Personally, I'd probably use a Cm of 1.0. But, I think that M2 minimum equation woudl allow you to justify a Cm of 0.6.

RE: Concrete Column Cm factor

You forgot to account for minimum moment caused by excentricity prescribed by code.

M2 need to be at least Cm*M2_Min !

RE: Concrete Column Cm factor

Sorry for double answering..... I didn't saw the first anwser of JoshPlum !

RE: Concrete Column Cm factor

Personnaly I use Cm=1.0 because the column subjected only to minimum moment will be in single curvature.

The ration M1/M2 = 1.0 where M1=M2=M_Min is discutable because of the slab dead load cause slab bending that can reduce the M1/M2 ratio...

To be safe I use Cm=1 & M1/M2 = 1.0 for minimum moment ..but I know that not all engineer aggree with me - they find that too much conservative !

RE: Concrete Column Cm factor

(OP)
Thanks everyone for your response. I knew about the minimum moment and was accounting for that in the design. It sounds like Cm = 1 is the way to go.

RE: Concrete Column Cm factor

Cm accounts for reverse curvatures of columns to your benefit to account for end moments with same sign.

Since, analysis doesn't give you end moments except for code required minimum, I believe, you cannot take advantage of Cm being less than 1.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources