INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material
2

preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

(OP)
What is required for preheating and post weld heat treatment of 1 1/4 Chrome-moly material?

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

To what Code?

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

(OP)
ASME Section VIII Div 1!

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

orion952, see Part UCS

Regards,

Mike

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

(OP)
I understand Section UCS covers the post weld heat treatment requirements. My concern is any required preheat for welding and if that preheat has to be maintained until the weldment enters the furnace for PWHT. This I undersatnd has been required or recommended for certain chrome-moly grades to prevent cracking of the welds. I am trying to find out if SA-387 Grade 11 class 2 material requires such continuous preheat until PWHT starts.

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

orion952 Part UCS does specifiy pre-heat under some conditions, but to my experience maintaining pre-heat thru PWHT is not needed for 1 1/4 Cr materials. More commmon with 2 1/4 Cr.

Do not take this as definitive, your weld procedures, your service, your job specs (if any) may require different.

I doubt Sec VIII, Div 1 is going to require maintenance of pre-heat in any case, I think it is going to be mandated by metallurgy and desired properties.

Regards,

Mike

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

Preheat maintenance is not required. Preheat should be 250 F min - 300F recommended. If welding is interrupted, recommend slow cooling under insulation for T > 1/2". Greater adherence to preheat is mandated as thickness and joint restraint increase. Hydrogen embrittlement can and will occur if you do not appreciate the need for preheat.

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

I purchased a reactor last year for the same materail except it is class 1, ready to ship. Here is the requirement:

"Welded joints shall be heat treated immediately upon completion of welding.
The joint shall not be allowed to cool below 300 ºF (150 ºC) prior to heat
treatment. Alternately, the weld and adjacent metal may be heated to 600 ºF
(315 ºC), wrapped with insulation, and allowed to cool. Heat treatment may
then be performed later. "

The other source is API 934-E (1 1/4Cr-1/2Mo for above 825F), para 7.3.1 stating " During welding, the preheat temp shall be maintained until PWHT or dehydrogenation heat treatment (DHT) is performed in accordance with 7.3.2".
7.3.2 saying DHT to be 570F minimum for one hour minimum.

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

(OP)
Ok, now I have conflicting recommendations. the only difference is I have class 2 material, not class 1 and my design temeperature is 250 F for one vessel and 650 F for the second vessel.

RE: preheat & post weld heat treatment of SA-387 Gr 11 Class 2 ( 1 1/4 Chrome-moly) material

If your vessel is in high pressure hydrogen service, check API 934-C for below 825F service. It has the same statement as 934-E. Both class 1 and 2 make no difference on preheat and PWHT requirements, only material properties are different as I understand.
Years ago we had vessel ordered as class 2. However, the tensile and yield failed to meet the values, and re-certified as class 1.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources